NEM Generating Unit Outage / Maintenance Plan (Internal)
Internal generating-unit outage and maintenance plans held by a NEM generator before (or in more detail than) the public PASA submission: planned outage schedules and overhaul programmes listing the unit or DUID, outage start and finish dates, MW deratings, unit states, work scope and return-to-service (RTS) dates or unit recall times. The unit-level PASA availability and unit-state codes AEMO publishes under NER cl 3.7.2(f)(5) (NEMweb MTPASA_DUIDAvailability / STPASA_DUIDAvailability) are public and treated as decoys; the plan detail behind them (scope, work orders, exact dates, reason narrative, drafts not yet submitted) is not published.
- Type
- regex
- Engine
- boost_regex
- Confidence
- medium
- Confidence justification
- Medium: "planned outage" and "return to service" are generic (IT, network and fleet maintenance use them), so enforce tiers require generator-specific structure: a dated schedule row carrying MW or an NER unit-state token, or a populated DUID / outage / RTS field. Public AEMO PASA CSVs are excluded on their header markers. 85/75 are heuristic evidence tiers, not measured accuracy.
- Jurisdictions
- au
- Regulations
- National Electricity Rules, Security of Critical Infrastructure Act 2018 (Cth)
- Frameworks
- ISO 27001
- Data categories
- energy-market, infrastructure, business
- Scope
- narrow
- Risk rating
- 7
- Platform compatibility
- Purview: Compatible, GCP DLP: Compatible, Macie: Compatible, Zscaler: Compatible, Palo Alto: Degraded, Netskope: Unsupported
Pattern
(?i)\b(?:(?:planned|unit|generating\s+unit|major|minor|maintenance)\s+outage\s+(?:plan|schedule|programme|program|window)|outage\s+plan(?:\s+rev(?:ision)?)?|planned\s+outage|maintenance\s+outage|overhaul\s+(?:plan|schedule|programme)|return\s+to\s+service|RTS\s+date|unit\s+recall\s+time)\b
Corroborative evidence keywords
DUID, derate, return to service, unit recall time, PASA availability, work order, scope of work, overhaul
Proximity: 300 characters
Should match
Unit 3 major outage plan - rev C DRAFT (not yet submitted to AEMO) DUID: TARONG3X Outage start: 02/03/2027 RTS date: 14/04/2027 Schedule: 02/03/2027 to 09/03/2027 unit offline 0 MW OUTAGEPLANBASIC boiler inspection 10/03/2027 to 14/04/2027 turbine overhaul, HP rotor exchange Scope of work: HP/IP turbine overhaul, boiler tube replacement, work order WO-448120.— Draft major outage plan with DUID, outage and RTS fields, dated MW / unit-state row and work scope - intended 85Planned outage schedule - Kogan Ridge Units 1-2 Unit: KRIDGE1 15/11/2026 - 22/11/2026 derated to 180 MW for mill overhaul Return to service: 23/11/2026 06:00 Work order: 7732019— Planned outage schedule with populated unit and work-order fields and a derating row - intended 85Minor outage window, Unit 2 05/06/2027 to 07/06/2027 DERATINGPLANBASIC 210 MW available; condenser tube cleaning.— Outage window with a dated row carrying a unit-state token and MW - intended 75Maintenance outage for the air heater has been moved. DUID: STANW4B Revised timing has been agreed with operations.— Maintenance outage note with a populated DUID field - intended 75
Should not match
C,NEMP.WORLD,MTPASA_DUIDAVAILABILITY,AEMO,PUBLIC,2026/09/24,10:00:00 I,MTPASA,DUIDAVAILABILITY,1,DAY,REGIONID,DUID,PASAAVAILABILITY,PASAUNITSTATE,PASARECALLTIME,LATEST_OFFER_DATETIME D,MTPASA,DUIDAVAILABILITY,1,2026/10/01,QLD1,BARCALDN,0,OUTAGEPLANBASIC,48,2026/09/23 14:00:00 planned outage return to service— Public AEMO MTPASA_DUIDAvailability extract with unit-state codesPASA availability means the physical plant capability available in a particular period, including any physical plant capability that can be made available during that period on 24 hours notice. The unit state must distinguish between a physical and economic reason for unavailability, and the unit recall time is the period in which the plant can be made available.— NER definitions of PASA availability, unit state and unit recall timePlanned outage: the customer portal will be unavailable from 01/10/2026 to 02/10/2026 while we upgrade servers. Service will return to service by 6am.— IT planned outage notice with a date range but no MW or generator fieldsOutage plan template DUID: ________ Outage start: [dd/mm/yyyy] RTS date: [dd/mm/yyyy] Derated to: ___ MW— Blank outage plan templateA unit at the Queensland coal station tripped offline on Monday and is expected to return to service later this week, the operator said, as AEMO issued a market notice on reserve levels.— News report / market notice
Known false positives
- AEMO public MT PASA and ST PASA DUID availability files list DUIDs, PASA availability and unit-state codes. Mitigation: The ",AEMO,PUBLIC," header, PUBLIC_MTPASA / PUBLIC_STPASA filenames, I,MTPASA,DUIDAVAILABILITY and the PASAAVAILABILITY,PASAUNITSTATE column header are excluded within the proximity window.
- IT, telecommunications and network planned-outage notices. Mitigation: Enforce tiers require a MW figure, NER unit-state token or populated DUID / unit / RTS / work-order field.
- NER definitions, AEMO ESOO and MT PASA reports, market notices and news about unit trips. Mitigation: No populated schedule rows or plan fields; ESOO, market notice and media release terms are excluded.