Incident postmortem reports
Identifies incident postmortems and post-incident reviews with populated incident detail: timestamped timeline entries, incident/problem references, impact metrics or affected hosts. Generic "timeline", "root cause" and "lessons learned" wording no longer matches.
- Type
- regex
- Engine
- boost_regex
- Confidence
- medium
- Confidence justification
- Medium confidence: postmortem wording is discovery-only; enforcement requires timeline, reference, metric or host structure, and 85 adds a second structure and findings context.
- Detection quality
- Topic false positive
- Jurisdictions
- global
- Regulations
- Criminal Code Act 1995 (Cth)
- Frameworks
- ISO 27001, NIST CSF
- Data categories
- security, technology
- Scope
- wide
- Risk rating
- 7
- Platform compatibility
- Purview: Compatible, GCP DLP: Compatible, Macie: Compatible, Zscaler: Compatible, Palo Alto: Degraded, Netskope: Unsupported
Pattern
(?i)\b(?:(?:incident|outage|blameless)\s+post[\s-]?mortems?|post[\s-]?mortem\s+(?:report|review|document|analysis)\s+(?:for|of|on)\s+(?:the\s+)?(?:incident|outage|INC)|post[\s-]incident\s+(?:review|report|analysis)|PIR\s+(?:report|document)|incident\s+retrospective|root\s+cause\s+analysis\s+(?:report\s+)?for\s+(?:the\s+)?(?:incident|outage|INC))\b
Corroborative evidence keywords
contributing factor, corrective action, action item, detection gap, lessons learned
Proximity: 300 characters
Should match
Incident postmortem - payments outage (blameless) Incident ID: INC0048213 Duration: 47 minutes Customers affected: ~1,900 Timeline (AEST): 09:02 - Deploy of payments-api 2.14.0 to pay-app03.example.internal 09:06 - Error rate alert fired in the monitoring console 09:49 - Rollback completed and service restored Contributing factor: connection pool limit halved in the new release. Corrective action: add a pool-size check to the release pipeline (owner: Platform team).— High tier (85) - incident reference, impact metrics, timeline entries and host with contributing factor/corrective actionPost-incident review for the email outage - Incident ID: INC0051190, service restored after the relay swap.— Medium tier (75) - incident reference onlyOutage postmortem notes: time to detect: 22 minutes because the alert was muted.— Medium tier (75) - impact metric onlyThe post-incident review meeting is booked for Tuesday.— Discovery tier (65) - postmortem wording only
Should not match
The project timeline slipped by two weeks.— Generic timeline wording is no longer a primaryThe coroner ordered a post-mortem examination.— Medical post-mortemGuidance note: a good post-incident review records a timeline, contributing factors and corrective actions.— Guidance textPostmortem report template Incident ID: ______ Duration: ______ 00:00 - ______— Blank templateTraining module: this mock incident postmortem walks through an outage at 09:00 - Alert fired, Duration: 30 minutes.— Training/mock framing must not enforce
Known false positives
- SRE guidance, postmortem-writing templates and training describe timelines and corrective actions. Mitigation: Postmortem wording is discovery-only; enforcement needs populated structure, and guidance/training/mock/template framing is excluded.
- Medical/coronial post-mortem examinations. Mitigation: Primary requires incident/outage/blameless context or an incident reference after postmortem report/review.