Electric grid dispatch plans
Identifies substantive electric-grid generation dispatch, unit-commitment, and power-system dispatch plans. Topic phrases are retained for discovery; enforcement requires populated generation, reserve, energy, or reactive-power quantities, and high confidence also requires current interval, generating unit, constraint, interconnector, or grid-operator detail.
- Type
- regex
- Engine
- boost_regex
- Confidence
- medium
- Confidence justification
- Medium confidence requires populated dispatch quantities rather than general market commentary. High confidence adds a current interval, named unit, constraint, interconnector, or operator reference.
- Detection quality
- Topic verified
- Jurisdictions
- global
- Regulations
- GDPR
- Data categories
- security
- Scope
- wide
- Risk rating
- 9
- Platform compatibility
- Purview: Compatible, GCP DLP: Compatible, Macie: Compatible, Zscaler: Compatible, Palo Alto: Degraded, Netskope: Unsupported
Pattern
(?is)\b(?:electric\s+grid\s+dispatch\s+plan|generation\s+dispatch\s+schedule|generation\s+dispatch|unit\s+commitment\s+schedule|power\s+system\s+dispatch\s+plan)\b
Corroborative evidence keywords
electric grid dispatch plans, electric, grid, dispatch, plans, critical, infrastructure, systems
Proximity: 300 characters
Should match
electric grid dispatch plan— Low-tier probe - dispatch topic without populated quantitiesGeneration dispatch schedule: unit commitment 420 MW and reserve requirement 35 MW— Medium-tier probe - populated quantities without current unit or interval detailCurrent generation dispatch schedule for generating unit GT-04, dispatch interval 14:05, constraint ID QNI-17: target 420 MW and reserve 35 MW— High-tier probe - populated quantities with current unit, interval, and constraint detail
Should not match
unrelated generic text— No relevant phrase contextplaceholder value 12345— Random text should not match phrase markerThe annual report discusses electricity generation investment and market trends.— Public commentary without a dispatch plan or populated scheduleTraining example: current generation dispatch schedule for unit GT-04 at 420 MW, interval 14:05— Explicit training content must not enforce
Known false positives
- Public market reports and grid-planning material can discuss generation dispatch, unit commitment, reserves, and MW quantities. Mitigation: Recommend the 85 tier, which additionally requires current interval, generating-unit, constraint, interconnector, or operator detail.
- Training simulations can include realistic unit IDs, intervals, constraints, and dispatch quantities. Mitigation: Reject explicit template, demo, tutorial, sample-data, and training-example framing from enforcing tiers.