Plant shutdown and startup procedures
Identifies substantive industrial plant shutdown, startup, emergency-shutdown, and turnaround procedures. Topic phrases are retained for discovery; enforcement requires ordered isolation, depressurisation, purge, valve, pump, permissive, interlock, handback, or verification actions, and high confidence also requires a populated equipment identifier, operating value, or timing.
- Type
- regex
- Engine
- boost_regex
- Confidence
- medium
- Confidence justification
- Medium confidence requires executable process actions rather than a procedure title. High confidence adds live equipment, operating, or timing detail.
- Detection quality
- Topic false positive
- Jurisdictions
- global
- Regulations
- GDPR
- Data categories
- security
- Scope
- wide
- Risk rating
- 8
- Platform compatibility
- Purview: Compatible, GCP DLP: Compatible, Macie: Compatible, Zscaler: Compatible, Palo Alto: Degraded, Netskope: Unsupported
Pattern
(?is)\b(?:plant\s+shutdown\s+and\s+startup\s+procedure|plant\s+shutdown\s+procedure|plant\s+startup\s+procedure|emergency\s+shutdown\s+procedure|shutdown\s+sequence\s+procedure|startup\s+sequence\s+procedure|turnaround\s+startup\s+procedure)\b
Corroborative evidence keywords
plant shutdown and startup procedures, plant, shutdown, startup, procedures, critical, infrastructure, systems
Proximity: 300 characters
Should match
plant shutdown and startup procedure— Low-tier probe - procedure topic without executable actionsPlant shutdown procedure: isolate feed, close valve, depressurize, purge the line, verify zero energy, and complete the interlock check— Medium-tier probe - ordered process actions without populated equipment or valuesPlant shutdown procedure for unit ID: U-04: isolate feed, close valve tag: XV-204, depressurize to 0.2 MPa within 15 minutes, and verify the ESD interlock— High-tier probe - ordered actions with equipment, pressure, timing, and interlock detail
Should not match
unrelated generic text without domain phrases— No relevant topic phrases presentplaceholder value 12345— Random text should not match topic-specific regexshutdown checklist— Generic word pair from old broad template should not matchThe process-safety standard describes principles for safe plant shutdown.— General safety guidance without an executable procedureTraining example: plant shutdown procedure for unit U-04, valve XV-204, 0.2 MPa within 15 minutes— Explicit training content must not enforce
Known false positives
- Process-safety standards and maintenance guidance discuss shutdown, startup, isolation, purge, and interlocks without exposing an executable plant procedure. Mitigation: Keep procedure topics discovery-only and require concrete ordered process actions for enforcement.
- Training simulations can include realistic equipment tags, pressures, timing, and emergency-shutdown steps. Mitigation: Reject explicit template, demo, tutorial, sample-data, and training-example framing from enforcing tiers.
References
- https://www.legislation.gov.au/C2018A00029/latest/text
- https://www.cyber.gov.au/resources-business-and-government/essential-cyber-security/ism