Dam safety and integrity reports

Detects dam safety and integrity engineering reports: dam safety review, surveillance or inspection report wording with instrumentation readings (piezometers, seepage weirs, survey marks, reservoir levels) and located condition findings (seepage, cracking, erosion at the toe, spillway or abutment). Distinct from the referable-dam emergency action plan classifier, which covers EAP notification and inundation content. Topic wording alone is discovery-only.

Type
regex
Engine
boost_regex
Confidence
medium
Confidence justification
Medium confidence: the topic phrase alone is discovery-only; enforcement needs populated structure (an instrumentation reading with units (piezometer, V-notch/seepage weir, inclinometer, settlement point, survey mark, reservoir level/FSL) or a located condition finding (seepage, cracking, erosion, slumping, settlement, spalling, scour, sinkhole, boil or piping at a chainage, toe, face, spillway, abutment, crest, gallery or outlet)), and 85 needs two distinct structures plus independent engineering-assessment (remedial works, risk rating, consequence category, dam safety engineer, recommendations) evidence, so policies, blank forms and training text stay below 75.
Detection quality
Topic false positive
Jurisdictions
global
Regulations
Security of Critical Infrastructure Act 2018 (Cth), Water Supply (Safety and Reliability) Act 2008 (Qld)
Frameworks
ISO 27001, NIST CSF
Data categories
security, location
Scope
wide
Risk rating
8
Platform compatibility
Purview: Compatible, GCP DLP: Compatible, Macie: Compatible, Zscaler: Compatible, Palo Alto: Degraded, Netskope: Unsupported

Pattern

(?i)\b(?:dam\s+(?:safety|integrity|surveillance|condition)\s+(?:review|report|inspection|assessment|audit)s?|(?:comprehensive|periodic|annual|routine|special)\s+(?:dam\s+(?:safety\s+)?)?inspection\s+report|dam\s+failure\s+(?:analysis|impact\s+assessment)|embankment\s+(?:condition|stability)\s+(?:assessment|report)|dam\s+safety\s+and\s+integrity\s+reports?)\b

Corroborative evidence keywords

remedial works, risk rating, consequence category, dam safety engineer, urgent, repair, geotechnical, monitoring frequency, deficiency, recommendation

Proximity: 300 characters

Should match

Should not match

Known false positives

References